Subscribe now to the Teledyne LeCroy Signal Integrity Academy
Subscribe to the Teledyne Lecroy SI Academy Monthly Newsletter
Lesson HSDD-20-28 2017 week 5 HOL
with Eric Bogatin,
Signal Integrity Evengelist
Teledyne LeCroy Front Range Signal Integrity Lab
SUBSCRIPTION ONLY CONTENT
Subscribers click here to log in.

HSDD-20-28 2017 week 5 HOL

  • These are two hands on labs using Hyperlynx
  • First one is evaluating the driver: output resistance, rise time, pacakge model
  • Second one is about point to point topology and terminations
  • Look at rising edge, clocks, PRBS signals and single bit response
  • What is an advantage of the Vtt termination? what value of R and Vtt is optimum?

Click the Zip Icon to download supporting files for this lesson.